Sand Springs, Nevada. The new grade across the Fallon Sink built at a cost of $76,000 between Sand Springs and the four and eight mile flats in Churchill County at distance of 11.7 miles. The grade is over five feet above flat, concrete culverts and a surface of flat covered with crystallized borax. Lincoln Highway Association project #1 involving $45,500 from General Motors Fund.
Viewer
About this Item
Record Details
- Title
- Sand Springs, Nevada. The new grade across the Fallon Sink built at a cost of $76,000 between Sand Springs and the four and eight mile flats in Churchill County at distance of 11.7 miles. The grade is over five feet above flat, concrete culverts and a surface of flat covered with crystallized borax. Lincoln Highway Association project #1 involving $45,500 from General Motors Fund.
- Year
- n.d.
- Filing Code
- Nev. 77
- Size
- Large
- Accession No.
- lhc0754
Image Metadata
- Image Digitization Date
- 2011-09-10 11:13:05 -0400
- Image Source: Dimension
- 5927 x 2291
- Image Source: File Size
- 38 MB
- Image Source: Resolution
- 500dpi
Technical Details
- Collection
- Lincoln Highway Digital Image Collection
- Image Size
- 5927 x 2291
- File Size
- 440 KB
- Record
- lhc0754
- Link to this Item
-
https://quod.lib.umich.edu/l/linchigh/x-lhc0754/lhc0754
Rights and Permissions
The University of Michigan Library provides access to these materials for educational and research purposes. These materials may be under copyright. If you decide to use any of these materials, you are responsible for making your own legal assessment and securing any necessary permission. If you have questions about the collection, please contact the Special Collections Research Center. If you have concerns about the inclusion of an item in this collection, please contact Library Information Technology.
Related Links
IIIF
- Manifest
-
https://quod.lib.umich.edu/cgi/i/image/api/manifest/linchigh:LHC0754:LHC0754
Cite this Item
View the Help Guide for more information.
- Full citation
-
"Sand Springs, Nevada. The new grade across the Fallon Sink built at a cost of $76,000 between Sand Springs and the four and eight mile flats in Churchill County at distance of 11.7 miles. The grade is over five feet above flat, concrete culverts and a surface of flat covered with crystallized borax. Lincoln Highway Association project #1 involving $45,500 from General Motors Fund." In the digital collection Lincoln Highway Digital Image Collection. https://quod.lib.umich.edu/l/linchigh/x-lhc0754/lhc0754. University of Michigan Library Digital Collections. Accessed May 18, 2024.